Related AWC field video
Subfloor retrofit and blocking
AWC field footage of exposed floor bays, insulation and support details before closure. About 57 seconds.
Watch on YouTube ↗Subfloor Repair · San Diego County
AWC’s project record describes deteriorated subfloor in two separate bathrooms, including the shower areas. These real job photos follow the open-floor work and later fixture-installation stages.
Lakeside, San Diego County
The opening-stage photographs show wall framing, floor openings and services below the bathrooms. Access to plumbing, wiring and ductwork needs to be considered with the floor repair.
These progress photographs show insulation within the floor bays and the relationship between framing and plumbing. Construction-stage records help explain work that will be concealed later.
The later photographs show fixtures back in the two bathrooms. Wall perimeters and floor finishes remain open in these images, so they are labeled as progress stages.
These public AWC videos show floor and shower work stages. They are separate company-work references.
Related AWC field video
AWC field footage of exposed floor bays, insulation and support details before closure. About 57 seconds.
Watch on YouTube ↗Related AWC field video
AWC footage showing backing preparation and a molded shower surround with surrounding framing still open. About one minute.
Watch on YouTube ↗Talk through your repair with All World Construction LLC.